← Plane Workbook
AD review
Logbook entry
Digital Logbook
N3668N · 1947 Supercruiser · the maintenance record from the last annual to today (14 CFR 91.417)
Status
Last annual
2026-03-02
Annual due
2027-03-31
Aircraft total time
6430 hrs
ADs on file (separate document)
0 of 14 done
AD review & print →
Date of the last annual inspection
Save
The 2026-03-02 annual inspection entry is not in the digital logbook yet.
Build the entries
below from the paper logbooks — start with the annual, then every entry after it — as the FAA requires the records back to the last annual (14 CFR 91.417).
Logbook entries since 2026-03-02
🖨 Print logbook
All
Airframe
Engine
Propeller
Avionics
No entries in the Avionics logbook since the last annual — build them below.
Build an entry (from the paper logbook)
Date
Logbook
Airframe
Engine
Propeller
Avionics
Entry type
Inspection (43.11)
Maintenance / repair / alteration (43.9)
Inspection
annual
100-hour
progressive
condition
Aircraft total time (hrs)
Signed by (name)
Certificate kind
A&P
IA
Repair Station
Private pilot (preventive maintenance)
Certificate no.
Project (optional)
Description of work performed (copy it as written in the logbook)
+ Add to the digital logbook
Cancel edit
Typed-in entries are marked
Built
; the paper logbook with the signatures stays the legal record.